{"id":1989,"date":"2026-08-16T20:56:21","date_gmt":"2026-08-16T12:56:21","guid":{"rendered":"https:\/\/jutrion.com\/?p=1989"},"modified":"2026-08-16T20:56:24","modified_gmt":"2026-08-16T12:56:24","slug":"%d9%85%d8%a7-%d8%ad%d8%ac%d9%85-%d8%b5%d9%86%d8%af%d9%88%d9%82-%d8%aa%d8%ac%d9%85%d9%8a%d8%b9-%d8%a7%d9%84%d8%b7%d8%a7%d9%82%d8%a9-%d8%a7%d9%84%d8%b4%d9%85%d8%b3%d9%8a%d8%a9-%d8%a7%d9%84%d8%b0%d9%8a","status":"publish","type":"post","link":"https:\/\/jutrion.com\/ar\/what-size-solar-combiner-box-do-i-need\/","title":{"rendered":"\u0645\u0627 \u0647\u0648 \u062d\u062c\u0645 \u0635\u0646\u062f\u0648\u0642 \u062a\u062c\u0645\u0639 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0634\u0645\u0633\u064a\u0629 \u0627\u0644\u0630\u064a \u0623\u062d\u062a\u0627\u062c\u0647\u061f \u0639\u062f\u062f \u0627\u0644\u0633\u0644\u0633\u0644\u0629\u060c \u0627\u0644\u0645\u0635\u0647\u0631\u060c \u062a\u062d\u062f\u064a\u062f \u062d\u062c\u0645 \u0627\u0644\u062a\u064a\u0627\u0631 \u0648\u0627\u0644\u062c\u0647\u062f"},"content":{"rendered":"\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<h2 class=\"wp-block-heading has-palette-color-9-color has-text-color has-link-color has-large-font-size wp-elements-1\">Quick Answer: What Size Solar Combiner Box Do You Need?<\/h2>\n<\/blockquote>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"256\" src=\"https:\/\/jutrion.com\/wp-content\/uploads\/2026\/08\/01-solar-combiner-box-sizing-overview-1200x300-1-1024x256.png\" alt=\"\" class=\"wp-image-1991\" srcset=\"https:\/\/jutrion.com\/wp-content\/uploads\/2026\/08\/01-solar-combiner-box-sizing-overview-1200x300-1-1024x256.png 1024w, https:\/\/jutrion.com\/wp-content\/uploads\/2026\/08\/01-solar-combiner-box-sizing-overview-1200x300-1-300x75.png 300w, https:\/\/jutrion.com\/wp-content\/uploads\/2026\/08\/01-solar-combiner-box-sizing-overview-1200x300-1-768x192.png 768w, https:\/\/jutrion.com\/wp-content\/uploads\/2026\/08\/01-solar-combiner-box-sizing-overview-1200x300-1.png 1200w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><code><em>Four PV strings connected through a fused solar combiner box to an inverter MPPT input<\/em><\/code><\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">A solar combiner box should match the number of compatible PV strings feeding one inverter input, the array&#8217;s highest cold-weather open-circuit voltage, the combined Isc-based design current, and the protection required at that location. Input count alone is not enough. Four strings may need one 4-in\/1-out box, two separate 2-in\/1-out circuits, or no external combiner at all, depending on the inverter and cable layout.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For a buyer, \u201c4 strings, 1000 V\u201d sounds like a usable specification. For the engineer checking the quotation, it is only the beginning. The module datasheet may show that the string approaches 1000 V on a cold morning. The inverter may assign the strings to two independent MPPTs. The output path may need to carry nearly 70 A after the project&#8217;s current factor is applied. Any one of those facts can change the box.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The aim here is to turn the information already present on the module datasheet, inverter schedule and single-line diagram into a defensible preliminary specification. For general configurations and available product options, see the&nbsp;<a href=\"https:\/\/jutrion.com\/pv-combiner-box\/\">JUTRION PV combiner box range<\/a>.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<h2 class=\"wp-block-heading has-palette-color-9-color has-text-color has-link-color has-large-font-size wp-elements-2\">Start with the Inverter Drawing, Not the Number of Strings on the Roof<\/h2>\n<\/blockquote>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"256\" src=\"https:\/\/jutrion.com\/wp-content\/uploads\/2026\/08\/02-pv-string-mppt-grouping-combiner-box-1200x300-1-1024x256.png\" alt=\"\" class=\"wp-image-1992\" srcset=\"https:\/\/jutrion.com\/wp-content\/uploads\/2026\/08\/02-pv-string-mppt-grouping-combiner-box-1200x300-1-1024x256.png 1024w, https:\/\/jutrion.com\/wp-content\/uploads\/2026\/08\/02-pv-string-mppt-grouping-combiner-box-1200x300-1-300x75.png 300w, https:\/\/jutrion.com\/wp-content\/uploads\/2026\/08\/02-pv-string-mppt-grouping-combiner-box-1200x300-1-768x192.png 768w, https:\/\/jutrion.com\/wp-content\/uploads\/2026\/08\/02-pv-string-mppt-grouping-combiner-box-1200x300-1.png 1200w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><code><em>Correct PV string grouping for one MPPT compared with incorrectly bridging separate MPPT inputs<\/em><\/code><\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The strings entering one combiner output must have somewhere valid to go. That sounds obvious, yet it is where many early quotations go wrong.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Suppose a rooftop has eight strings. The inverter drawing assigns four to MPPT A and four to MPPT B. Calling for an 8-in\/1-out combiner would join two circuits that the inverter was designed to control independently. The workable choices are normally two separate 4-in\/1-out groups, one enclosure containing two electrically independent sections, or direct string connections if the inverter already provides suitable inputs and protection.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Strings intended to operate in parallel should also be genuinely compatible. Check the module type, modules per string, orientation and expected shading. Unequal string lengths have different operating voltages. Combining heavily shaded and unshaded strings can also produce a poor operating match even when the module labels are identical.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This gives the first usable rule:<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">Count the strings assigned to one compatible MPPT path, not every string visible on the project drawing.<\/p>\n<\/blockquote>\n\n\n\n<h3 class=\"wp-block-heading has-palette-color-9-color has-text-color has-link-color has-medium-font-size wp-elements-3\">When an External Combiner Adds Little Value<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Many string inverters already provide multiple DC inputs, internal surge protection and a DC isolating function. If each string can run directly to a suitable inverter input, adding an external combiner may create extra cable terminations without solving a design problem.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A single-string box is a related but different case. A 1-in\/1-out unit does not combine current; it acts as an external protection and isolation box. That can be useful where the inverter is remote, a local isolation point is required, or the project wants replaceable surge protection in an accessible location.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<h2 class=\"wp-block-heading has-palette-color-9-color has-text-color has-link-color has-large-font-size wp-elements-4\">The Five Numbers Worth Putting on One Sheet<\/h2>\n<\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">Before looking at fuse sizes or enclosure dimensions, collect five groups of information. Most can be copied directly from issued project documents.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Information<\/th><th>Where it normally comes from<\/th><th>What it changes<\/th><\/tr><\/thead><tbody><tr><td>Voc, Isc, Imp, temperature coefficient and maximum series fuse<\/td><td>PV module datasheet<\/td><td>Voltage, current and string-fuse limits<\/td><\/tr><tr><td>Modules per string and number of parallel strings<\/td><td>String schedule<\/td><td>Input count and total voltage\/current<\/td><\/tr><tr><td>MPPT arrangement and input limits<\/td><td>Inverter datasheet and single-line diagram<\/td><td>Which strings may share an output<\/td><\/tr><tr><td>Minimum temperature, mounting and exposure<\/td><td>Project design basis and site data<\/td><td>Cold Voc, derating and enclosure<\/td><\/tr><tr><td>Destination country and applicable rules<\/td><td>Project specification<\/td><td>Protection method and documentation<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">One value that often gets missed is the inverter&#8217;s maximum permissible short-circuit current. The maximum operating current and maximum short-circuit current are not interchangeable. A proposed array should be checked against both.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The destination country matters just as much as the electrical data. A fuse calculation prepared for an IEC-oriented project should not quietly borrow a North American multiplier and present it as a universal rule.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<h2 class=\"wp-block-heading has-palette-color-9-color has-text-color has-link-color has-large-font-size wp-elements-5\">Check Cold String Voltage Before Choosing 1000 V or 1500 V<\/h2>\n<\/blockquote>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"256\" src=\"https:\/\/jutrion.com\/wp-content\/uploads\/2026\/08\/03-cold-weather-pv-string-voc-calculation-1200x300-1-1024x256.png\" alt=\"\" class=\"wp-image-1993\" srcset=\"https:\/\/jutrion.com\/wp-content\/uploads\/2026\/08\/03-cold-weather-pv-string-voc-calculation-1200x300-1-1024x256.png 1024w, https:\/\/jutrion.com\/wp-content\/uploads\/2026\/08\/03-cold-weather-pv-string-voc-calculation-1200x300-1-300x75.png 300w, https:\/\/jutrion.com\/wp-content\/uploads\/2026\/08\/03-cold-weather-pv-string-voc-calculation-1200x300-1-768x192.png 768w, https:\/\/jutrion.com\/wp-content\/uploads\/2026\/08\/03-cold-weather-pv-string-voc-calculation-1200x300-1.png 1200w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><code><em>Cold-weather PV string Voc calculation for 16 modules resulting in a 907.1 V design voltage<\/em><\/code><\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Module Voc is normally stated at standard test conditions. It rises as cell temperature falls, so the coldest expected condition controls the maximum string voltage.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Where the module datasheet gives a negative Voc temperature coefficient as a percentage per degree Celsius, an initial calculation is:<\/p>\n\n\n\n<div class=\"wp-block-group has-palette-color-8-color has-palette-color-9-background-color has-text-color has-background has-link-color wp-elements-6 is-layout-constrained wp-block-group-is-layout-constrained\">\n<p class=\"wp-block-paragraph\"><strong>V<sub>oc,cold<\/sub>&nbsp;= V<sub>oc,STC<\/sub>&nbsp;\u00d7 [1 + |\u03b2<sub>Voc<\/sub>| \u00d7 (25 \u2212 T<sub>min<\/sub>)]<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>V<sub>string,cold<\/sub>&nbsp;= V<sub>oc,cold<\/sub>&nbsp;\u00d7 number of modules in series<\/strong><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Enter the coefficient as a decimal. For example, \u22120.28%\/\u00b0C becomes 0.0028 in the formula. If the module manufacturer provides a different low-temperature method, use that method instead.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The answer has to fit more than the inverter. The fuse-link and holder, SPD, switch-disconnector or breaker, terminals, conductors and completed assembly all sit in the same DC circuit. Replacing only the SPD with a 1500 V device does not convert a 1000 V box into a 1500 V assembly.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A little unused voltage margin is not wasted capacity. It absorbs the project-specific temperature basis and tolerances that have actually been identified. What should be avoided is a random margin with no recorded source.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<h2 class=\"wp-block-heading has-palette-color-9-color has-text-color has-link-color has-large-font-size wp-elements-7\">String Fuses Depend on Reverse Current, Not on Habit<\/h2>\n<\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">When parallel strings are healthy, each contributes current to the common output. If one string develops a fault, the others may feed current back into it. The string fuse is there to interrupt that damaging reverse current where protection is required.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">An initial screen for the contribution from the other strings is:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>I<sub>reverse,screen<\/sub>&nbsp;= (n \u2212 1) \u00d7 I<sub>sc,string<\/sub><\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"256\" src=\"https:\/\/jutrion.com\/wp-content\/uploads\/2026\/08\/04-pv-string-reverse-current-gpv-fuse-1200x300-2-1024x256.png\" alt=\"\" class=\"wp-image-1995\" srcset=\"https:\/\/jutrion.com\/wp-content\/uploads\/2026\/08\/04-pv-string-reverse-current-gpv-fuse-1200x300-2-1024x256.png 1024w, https:\/\/jutrion.com\/wp-content\/uploads\/2026\/08\/04-pv-string-reverse-current-gpv-fuse-1200x300-2-300x75.png 300w, https:\/\/jutrion.com\/wp-content\/uploads\/2026\/08\/04-pv-string-reverse-current-gpv-fuse-1200x300-2-768x192.png 768w, https:\/\/jutrion.com\/wp-content\/uploads\/2026\/08\/04-pv-string-reverse-current-gpv-fuse-1200x300-2.png 1200w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><code><em>Reverse current from three healthy PV strings into a faulted string protected by a 20 A gPV fuse<\/em><\/code><\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Here, n is the number of parallel strings. The expression shows why the answer changes quickly between two and four inputs: a faulted string in a four-string group may receive current from three healthy strings.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Do not treat that expression as the finished protection design. The selected gPV fuse must carry expected current under the actual enclosure conditions, protect the cable and equipment, stay within the module&#8217;s maximum series-fuse rating, and have adequate PV DC voltage and breaking capability. The holder and fuse are checked together, including temperature and grouping effects.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/68843\" rel=\"noreferrer noopener\" target=\"_blank\">IEC 60269-6<\/a>&nbsp;covers supplementary requirements for fuse-links used in photovoltaic strings and arrays up to 1500 V DC. The installation rules adopted for the project determine how that product is applied.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-palette-color-9-color has-text-color has-link-color has-medium-font-size wp-elements-8\">About the 1.56 \u00d7 Isc Figure Seen Online<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The familiar 1.56 \u00d7 Isc figure is associated with two 125% factors used in common North American design paths. It should not be relabelled as a universal IEC formula. If the project is governed by the NEC, use the adopted edition, equipment listings and local requirements. If it is an IEC project, apply the relevant IEC-based installation rules and the module, fuse and cable manufacturers&#8217; instructions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This distinction is worth stating in the quotation. Otherwise, two suppliers may return different fuse sizes even though both received the same array data.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity is-style-wide\"\/>\n\n\n\n<blockquote class=\"wp-block-quote has-palette-color-9-color has-text-color has-link-color wp-elements-9 is-layout-flow wp-block-quote-is-layout-flow\">\n<h2 class=\"wp-block-heading has-palette-color-9-color has-text-color has-link-color has-large-font-size wp-elements-10\">Size the Combined Path Separately from Each Input<\/h2>\n<\/blockquote>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"256\" src=\"https:\/\/jutrion.com\/wp-content\/uploads\/2026\/08\/05-pv-combiner-box-total-current-sizing-1200x300-1-1024x256.png\" alt=\"\" class=\"wp-image-1996\" srcset=\"https:\/\/jutrion.com\/wp-content\/uploads\/2026\/08\/05-pv-combiner-box-total-current-sizing-1200x300-1-1024x256.png 1024w, https:\/\/jutrion.com\/wp-content\/uploads\/2026\/08\/05-pv-combiner-box-total-current-sizing-1200x300-1-300x75.png 300w, https:\/\/jutrion.com\/wp-content\/uploads\/2026\/08\/05-pv-combiner-box-total-current-sizing-1200x300-1-768x192.png 768w, https:\/\/jutrion.com\/wp-content\/uploads\/2026\/08\/05-pv-combiner-box-total-current-sizing-1200x300-1.png 1200w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><code><em>Four 13.8 A PV strings combined to 55.2 A Isc with a 69 A design screen and 80 A output-device candidate<\/em><\/code><\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The input and output sides carry different currents. Each input carries one string; the common output carries the sum of the parallel strings.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>I<sub>sc,total<\/sub>&nbsp;= number of parallel strings \u00d7 I<sub>sc,string<\/sub><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project&#8217;s required design factor and correction factors are then applied to the appropriate conductors and equipment. The result affects internal wiring, busbars, terminals, the outgoing cable and the output switching device. It also needs to be compared with the inverter&#8217;s stated limits.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Using Imp alone for the entire selection can leave the protection path too small. Using Isc alone without checking the inverter&#8217;s normal MPPT current can miss an operating limitation. Keep the values separate and give each one a purpose.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Value<\/th><th>Use it to check<\/th><\/tr><\/thead><tbody><tr><td>String Imp<\/td><td>Normal operating current and inverter MPPT compatibility<\/td><\/tr><tr><td>String Isc<\/td><td>String design current and overcurrent-protection calculations<\/td><\/tr><tr><td>Total Isc<\/td><td>Combined path and inverter short-circuit-current limit<\/td><\/tr><tr><td>Corrected project design current<\/td><td>Conductors, busbars, terminals and output device under installed conditions<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Heat can overrule an apparently comfortable catalogue rating. Closely grouped fuse-holders, terminal losses, the SPD and direct solar radiation all add to enclosure temperature. An 80 A device in a reference condition is not automatically an 80 A solution inside every outdoor box.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<h2 class=\"wp-block-heading has-palette-color-9-color has-text-color has-link-color has-large-font-size wp-elements-11\">Fuses, Isolation, Breakers and SPDs Have Different Jobs<\/h2>\n<\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">A combiner box is easier to specify when every component has one clear duty:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>gPV fuse:<\/strong>\u00a0protects an individual string against the applicable reverse-overcurrent condition;<\/li>\n\n\n\n<li><strong>switch-disconnector:<\/strong>\u00a0provides PV DC-rated load switching and a defined isolation point;<\/li>\n\n\n\n<li><strong>DC circuit breaker:<\/strong>\u00a0switches the circuit and provides an overcurrent function when its characteristics and DC interruption ratings suit the application;<\/li>\n\n\n\n<li><strong>PV DC SPD:<\/strong>\u00a0limits transient overvoltage and does not replace overcurrent protection or isolation.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">An output breaker is not mandatory simply because there is room for one. The system design may call for a switch-disconnector where overcurrent protection is already provided elsewhere, or for a breaker with a defined protective duty. Decide the function first.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The same principle applies to the SPD. Confirm the PV DC application, U<sub>CPV<\/sub>, protection modes, protection level, discharge-current duty, short-circuit behaviour and backup coordination. Type 2 is commonly used for induced surge conditions. Where an external lightning protection system or another lightning-current path is present, the arrangement may need Type 1 or Type 1+2 protection. See the&nbsp;<a href=\"https:\/\/jutrion.com\/spd\/\">JUTRION PV DC SPD range<\/a>&nbsp;after the project voltage and lightning context are known.<\/p>\n\n\n\n<p class=\"has-palette-color-8-color has-palette-color-9-background-color has-text-color has-background has-link-color wp-elements-12 wp-block-paragraph\">For the isolating function, a device rated for the intended PV duty is more meaningful than a generic \u201cDC switch\u201d description. The&nbsp;<a href=\"https:\/\/jutrion.com\/isolator-switch\/\">JUTRION PV DC isolator range<\/a>&nbsp;includes DC-PV2 options for review against the required voltage, current and pole arrangement.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity is-style-wide\"\/>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<h2 class=\"wp-block-heading has-palette-color-9-color has-text-color has-link-color has-large-font-size wp-elements-13\">A Four-String Example from Datasheet to Box<\/h2>\n<\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Illustrative example:<\/strong>&nbsp;This is a constructed commercial-rooftop case used to show the calculation. It is not a customer project or a universal design.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Four identical strings are assigned to one high-current inverter input. Each string contains 16 modules. The module datasheet gives Voc = 49.5 V, Isc = 13.8 A, \u03b2Voc = \u22120.28%\/\u00b0C and a maximum series-fuse rating of 25 A. The project minimum temperature is \u221215\u00b0C. Its design basis also applies a stated 3% allowance after the temperature calculation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The illustrative inverter has a 1000 V maximum DC input, an 80 A maximum input current and a 100 A maximum short-circuit current. No external lightning protection system is assumed.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-palette-color-9-color has-text-color has-link-color has-medium-font-size wp-elements-14\">The Drawing Points to Four Inputs and One Output<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">All four strings use the same modules and string length, and the inverter documentation permits them to feed the same input. A 4-in\/1-out architecture is therefore appropriate at this stage. If the drawing divided them between two MPPTs, the answer would become two independent 2-in\/1-out groups.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-palette-color-9-color has-text-color has-link-color has-medium-font-size wp-elements-15\">The Cold String Reaches 907.1 V<\/h3>\n\n\n\n<div class=\"wp-block-group has-palette-color-8-color has-palette-color-9-background-color has-text-color has-background has-link-color wp-elements-16 is-layout-constrained wp-block-group-is-layout-constrained\">\n<p class=\"wp-block-paragraph\"><strong>Cold module Voc = 49.5 \u00d7 [1 + 0.0028 \u00d7 (25 \u2212 (\u221215))] = 55.04 V<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Cold string Voc = 55.04 \u00d7 16 = 880.7 V<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Project design voltage = 880.7 \u00d7 1.03 = 907.1 V<\/strong><\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">A verified 1000 V assembly can pass this preliminary check, as can the illustrative inverter. The remaining margin is about 93 V. A seventeenth module would raise the result to approximately 964 V before the same allowance and would not pass this example after the allowance is applied.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-palette-color-9-color has-text-color has-link-color has-medium-font-size wp-elements-17\">Parallel Strings Make Individual Fusing Necessary<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The other three strings can contribute an initial reverse-current screen of:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>(4 \u2212 1) \u00d7 13.8 = 41.4 A<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That is above the module&#8217;s 25 A maximum series-fuse rating, so individual string protection is required in this example. The project method produces a preliminary lower fuse-current screen of 1.25 \u00d7 13.8 = 17.25 A. A 20 A gPV fuse sits between that value and the 25 A module limit. Before it is accepted, its holder, cable protection, enclosure temperature and continuous-current capability must be checked.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-palette-color-9-color has-text-color has-link-color has-medium-font-size wp-elements-18\">The Common Output Needs More Than a 55.2 A Label<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The combined short-circuit current is:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>4 \u00d7 13.8 = 55.2 A<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The example design basis uses 1.25 \u00d7 Isc as its preliminary output-current screen:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>1.25 \u00d7 55.2 = 69.0 A<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">An 80 A PV DC switch-disconnector is a reasonable starting frame, not an automatic final choice. The installed thermal rating, voltage, poles and switching duty remain to be checked. The inverter&#8217;s 100 A short-circuit limit passes the 55.2 A comparison. Its 80 A operating limit should be compared with four times the module Imp from the real datasheet.<\/p>\n\n\n\n<p class=\"has-palette-color-8-color has-palette-color-9-background-color has-text-color has-background has-link-color wp-elements-19 wp-block-paragraph\">The preliminary box is now specific enough to review: four independently fused inputs, one combined output, 1000 V-class components throughout, a combined path designed around the stated 69 A screen, PV DC isolation and a Type 2 PV DC SPD subject to final coordination.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-palette-color-9-color has-text-color has-link-color has-medium-font-size wp-elements-20\">The Result on One Page<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The calculation is easier to review when the assumptions, result and remaining check are kept together. This is also the point where a buyer can see whether two quotations are actually based on the same duty.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Selection item<\/th><th>Illustrative result<\/th><th>What still needs confirmation<\/th><\/tr><\/thead><tbody><tr><td>Configuration<\/td><td>4 inputs \/ 1 output<\/td><td>All four strings feed one compatible inverter input<\/td><\/tr><tr><td>Maximum project voltage<\/td><td>907.1 V<\/td><td>Site temperature basis, tolerance method and inverter limit<\/td><\/tr><tr><td>String protection<\/td><td>20 A gPV preliminary selection<\/td><td>Fuse-holder temperature, cable protection and applicable rules<\/td><\/tr><tr><td>Combined short-circuit current<\/td><td>55.2 A<\/td><td>Inverter maximum permissible short-circuit current<\/td><\/tr><tr><td>Preliminary output-current screen<\/td><td>69.0 A<\/td><td>Correction factors and installed assembly temperature<\/td><\/tr><tr><td>Output isolation<\/td><td>80 A frame is a starting candidate<\/td><td>PV DC duty, voltage, poles and installed current rating<\/td><\/tr><tr><td>Surge protection<\/td><td>Type 2 PV DC SPD initially<\/td><td>Ucpv, protection modes, LPS and backup coordination<\/td><\/tr><tr><td>Enclosure<\/td><td>Outdoor IP65 minimum<\/td><td>UV, corrosion, heat, glands and condensation<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<h2 class=\"wp-block-heading has-palette-color-9-color has-text-color has-link-color has-large-font-size wp-elements-21\">Choosing Between a 1\/1, 2\/1 and 4\/1 Configuration<\/h2>\n<\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">JUTRION currently displays 1000 V DC, IP65 products in 1-in\/1-out, 2-in\/1-out and 4-in\/1-out configurations. Use the input count to shortlist the architecture, then confirm the ratings that the project calculation produced.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Configuration<\/th><th>Typical reason to shortlist it<\/th><th>Reason to stop and reconsider<\/th><\/tr><\/thead><tbody><tr><td>1 input \/ 1 output<\/td><td>One string needs an accessible protection and isolation point<\/td><td>No combining occurs; verify that a separate box adds a required function<\/td><\/tr><tr><td>2 inputs \/ 1 output<\/td><td>Two matched strings feed one inverter input<\/td><td>The strings belong to separate MPPTs or exceed the combined-input limits<\/td><\/tr><tr><td>4 inputs \/ 1 output<\/td><td>Four matched strings feed one suitably rated high-current input<\/td><td>The inverter needs two MPPT groups or the output path is underrated<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The worked example points toward a JUPV1000-4\/1 architecture. It does not approve the internal fuse, output device or SPD by model name alone. Those parts have to be quoted against the 907.1 V project voltage, the proposed 20 A gPV string protection, the 69 A preliminary combined-current screen and the outdoor installation conditions.<\/p>\n\n\n\n<p class=\"has-palette-color-8-color has-palette-color-9-background-color has-text-color has-background has-link-color wp-elements-22 wp-block-paragraph\">Custom 1500 V or larger-string configurations deserve a fresh component and assembly check. They should not be treated as a label change to the 1000 V stock arrangement.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity is-style-wide\"\/>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<h2 class=\"wp-block-heading has-palette-color-9-color has-text-color has-link-color has-large-font-size wp-elements-23\">The Outdoor Enclosure Can Change the Current Rating<\/h2>\n<\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">Electrical calculations are often completed in an office at 25\u00b0C. The box may spend its working life on a roof where the air is much hotter, direct sunlight warms the enclosure, and several fuse-holders carry current side by side. That difference affects more than comfort during maintenance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Heat is produced at fuses, terminals, conductors, the SPD and the output device. Closely packed components have less opportunity to cool, while a sealed enclosure restricts air exchange. A component that carries its marked current under its reference conditions may require derating in the final assembly. This is why the 80 A switch-disconnector in the example remains a starting frame until the installed arrangement has been checked.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">IP65 is useful, but it answers only an ingress-protection question. It does not automatically establish:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>resistance to long-term ultraviolet exposure;<\/li>\n\n\n\n<li>corrosion performance near the coast or in an industrial atmosphere;<\/li>\n\n\n\n<li>acceptable internal temperature under full current and solar loading;<\/li>\n\n\n\n<li>condensation control during daily heating and cooling;<\/li>\n\n\n\n<li>suitability of cable glands, seals and materials for the installed cables;<\/li>\n\n\n\n<li>insulation performance at high altitude.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Mounting details also matter. Cable entries made through the top of an outdoor enclosure create a different water path from bottom entry. Undersized glands may damage seals or leave insufficient cable support. Tight cable bends can transfer mechanical force to fuse-holders and terminals. The enclosure should be reviewed as an installed assembly, not as an empty plastic or metal box with an IP number.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/30043\" rel=\"noreferrer noopener\" target=\"_blank\">IEC 61439-2:2020<\/a>&nbsp;covers power switchgear and controlgear assemblies up to 1500 V DC. The relevance here is practical: using individually rated components does not remove the need to verify the completed assembly, including temperature rise, dielectric properties, protective circuits, clearances, wiring and mechanical construction as applicable.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<h2 class=\"wp-block-heading has-palette-color-9-color has-text-color has-link-color has-large-font-size wp-elements-24\">Send Enough Information for the Supplier to Check the Result<\/h2>\n<\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">A short technical enquiry is more useful than a long purchasing template. Attach the module and inverter datasheets and state:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>strings per output and modules per string;<\/li>\n\n\n\n<li>module Voc, Isc, Imp, \u03b2Voc and maximum series fuse;<\/li>\n\n\n\n<li>minimum design temperature and any voltage allowance;<\/li>\n\n\n\n<li>inverter MPPT arrangement and input limits;<\/li>\n\n\n\n<li>calculated maximum voltage and combined design current;<\/li>\n\n\n\n<li>required fuse, isolation, breaker and SPD functions;<\/li>\n\n\n\n<li>enclosure location, IP requirement, ambient, UV and corrosion exposure;<\/li>\n\n\n\n<li>cable sizes, monitoring, destination market and quantity.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">For the illustrative project, that becomes: 4-in\/1-out, four identical 16-module strings feeding one MPPT, 907.1 V stated project design voltage, preliminary 20 A gPV fuses, 55.2 A total Isc, 69 A preliminary output-current screen, PV DC isolation, coordinated Type 2 PV DC surge protection and an outdoor enclosure.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-palette-color-9-color has-text-color has-link-color has-medium-font-size wp-elements-25\">Why Two \u201c4-String, 1000 V, IP65\u201d Quotations May Not Be Equivalent<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">One quotation may use gPV fuse-links and holders verified for the intended voltage and temperature. Another may list only a nominal fuse current. One box may provide a load-break switch-disconnector; another may use a device intended mainly for isolation. SPD Ucpv, protection modes, short-circuit behaviour and replaceability may also differ even when both quotations say \u201cType 2 SPD.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The common output is another source of hidden difference. Compare the installed current capability of the busbars, conductors, terminals and output device, not only the largest ampere number printed in the bill of materials. Also check terminal capacity against the actual outgoing cable. A technically lower-priced quotation is not cheaper if it requires replacement glands, a larger enclosure or rework at site.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A useful comparison therefore normalizes the following items before price:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>input\/output arrangement and MPPT grouping;<\/li>\n\n\n\n<li>maximum DC voltage of the complete path;<\/li>\n\n\n\n<li>string-fuse class, rating and module limit;<\/li>\n\n\n\n<li>combined current and installed temperature conditions;<\/li>\n\n\n\n<li>output device function and DC duty;<\/li>\n\n\n\n<li>SPD type, Ucpv, modes and coordination;<\/li>\n\n\n\n<li>terminal and cable-gland capacity;<\/li>\n\n\n\n<li>enclosure material and environmental suitability.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The final selection should read as one connected electrical path. If the quotation confirms only input count, nominal voltage and IP rating, it has not yet answered the sizing question.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity is-style-wide\"\/>\n\n\n\n<h3 class=\"wp-block-heading has-palette-color-9-color has-text-color has-link-color has-medium-font-size wp-elements-26\">Verify the Box After Installation<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A correct design can still be compromised by reversed polarity, loose terminations, damaged glands or a string connected to the wrong input. Commissioning should follow the project procedure and component instructions, with the DC circuit isolated and tested by qualified personnel.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Before energizing the combined output, record:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>string identity, polarity and measured open-circuit voltage;<\/li>\n\n\n\n<li>whether measured string voltages are reasonably consistent with the design and with one another;<\/li>\n\n\n\n<li>terminal tightening completed to the specified torque;<\/li>\n\n\n\n<li>protective-conductor and bonding continuity where required;<\/li>\n\n\n\n<li>fuse type and rating in every populated way;<\/li>\n\n\n\n<li>SPD status indication and remote alarm contact, if fitted;<\/li>\n\n\n\n<li>operation and position indication of the isolating device;<\/li>\n\n\n\n<li>labels, unused-entry seals, gland compression and enclosure closure.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">After the system has operated under representative load, inspect for abnormal heating, discoloration, odour, nuisance fuse operation or moisture. Where the project maintenance plan uses thermography, the baseline image is more useful when load and ambient conditions are recorded with it. The purpose is not to \u201cprove\u201d the design from one scan, but to leave a reference for later comparison.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/64171\" rel=\"noreferrer noopener\" target=\"_blank\">IEC 62548-1:2023<\/a>&nbsp;provides the broader IEC design context for PV arrays, including DC wiring, protection, switching and earthing. The completed assembly also needs appropriate verification;&nbsp;<a href=\"https:\/\/webstore.iec.ch\/en\/publication\/30043\" rel=\"noreferrer noopener\" target=\"_blank\">IEC 61439-2:2020<\/a>&nbsp;covers power switchgear and controlgear assemblies up to 1500 V DC. PV DC SPD requirements are addressed by&nbsp;<a href=\"https:\/\/webstore.iec.ch\/en\/publication\/26931\" rel=\"noreferrer noopener\" target=\"_blank\">IEC 61643-31<\/a>.<\/p>\n\n\n\n<p class=\"has-palette-color-8-color has-palette-color-9-background-color has-text-color has-background has-link-color wp-elements-27 wp-block-paragraph\">To compare the result with a JUTRION configuration, send the string schedule, module and inverter data, site temperature, protection requirements and destination standard through the&nbsp;<a href=\"https:\/\/jutrion.com\/pv-combiner-box\/\">PV combiner box page<\/a>. That gives both sides something more reliable to discuss than \u201cfour strings, best price.\u201d<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<h2 class=\"wp-block-heading has-palette-color-9-color has-text-color has-link-color has-large-font-size wp-elements-28\">Frequently Asked Questions<\/h2>\n<\/blockquote>\n\n\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list \">\n<div id=\"faq-question-1786881695301\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \">How Many Solar Strings Require a Combiner Box?<\/h3>\n<div class=\"rank-math-answer \">\n\n<p>There is no universal minimum. An external combiner is useful when compatible strings need to be paralleled before one inverter input, when it reduces long cable runs, or when the project needs a centralized location for fuses, isolation, surge protection or monitoring. If an inverter already accepts every string directly and provides the required functions, a separate combiner may not be necessary.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1786881732837\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \">What Size Fuse Should Be Used in a Solar Combiner Box?<\/h3>\n<div class=\"rank-math-answer \">\n\n<p>Select a PV-rated gPV fuse from the string Isc, applicable installation method, cable capacity, environmental conditions and module maximum series-fuse rating. The fuse must carry expected current without nuisance operation while remaining low enough to protect the module and cable. Do not apply 1.56 \u00d7 Isc as a universal IEC rule; the calculation depends on the destination standard.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1786881755882\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \">Can Strings Connected to Different MPPTs Share One Combiner Box?<\/h3>\n<div class=\"rank-math-answer \">\n\n<p>They may share a physical enclosure only if the MPPT circuits remain electrically separate. Do not combine the outputs of independent MPPT groups unless the inverter manufacturer explicitly permits that architecture. Each group should have its own compatible strings, output path and ratings.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1786881771523\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \">Do I Need a 1000V or 1500V PV Combiner Box?<\/h3>\n<div class=\"rank-math-answer \">\n\n<p>Calculate the maximum cold-weather open-circuit voltage of the complete string and include the allowances required by the project method. Select a voltage class that keeps the inverter and every component in the combiner path within rating. A 1500 V SPD alone does not make the completed box suitable for 1500 V.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1786881779730\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \">What Is the Difference Between a PV Combiner Box and a PV Protection Box?<\/h3>\n<div class=\"rank-math-answer \">\n\n<p>A PV combiner box joins two or more compatible string inputs into a common output. A 1-in\/1-out PV protection box does not combine strings; it provides a convenient location for functions such as isolation, surge protection or overcurrent protection on one string circuit.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n\n<h3 class=\"wp-block-heading has-palette-color-9-color has-text-color has-link-color has-medium-font-size wp-elements-29\">Technical References<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/64171\" target=\"_blank\" rel=\"noreferrer noopener\">IEC 62548-1:2023 \u2014 Photovoltaic (PV) arrays \u2014 Part 1: Design requirements<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/68843\" target=\"_blank\" rel=\"noreferrer noopener\">IEC 60269-6:2010+A1:2021 \u2014 Fuse-links for the protection of solar photovoltaic energy systems<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/30043\" target=\"_blank\" rel=\"noreferrer noopener\">IEC 61439-2:2020 \u2014 Power switchgear and controlgear assemblies<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/26931\" target=\"_blank\" rel=\"noreferrer noopener\">IEC 61643-31:2018 \u2014 SPDs for photovoltaic installations<\/a><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Quick Answer: What Size Solar Combiner Box Do You Need? A solar combiner box should match the number of compatible PV strings feeding one inverter input, the array&#8217;s highest cold-weather open-circuit voltage, the combined Isc-based design current, and the protection required at that location. Input count alone is not enough. Four strings may need one [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1997,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1989","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-electrical-guides"],"blocksy_meta":[],"_links":{"self":[{"href":"https:\/\/jutrion.com\/ar\/wp-json\/wp\/v2\/posts\/1989","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jutrion.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/jutrion.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/jutrion.com\/ar\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/jutrion.com\/ar\/wp-json\/wp\/v2\/comments?post=1989"}],"version-history":[{"count":2,"href":"https:\/\/jutrion.com\/ar\/wp-json\/wp\/v2\/posts\/1989\/revisions"}],"predecessor-version":[{"id":1998,"href":"https:\/\/jutrion.com\/ar\/wp-json\/wp\/v2\/posts\/1989\/revisions\/1998"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/jutrion.com\/ar\/wp-json\/wp\/v2\/media\/1997"}],"wp:attachment":[{"href":"https:\/\/jutrion.com\/ar\/wp-json\/wp\/v2\/media?parent=1989"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/jutrion.com\/ar\/wp-json\/wp\/v2\/categories?post=1989"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/jutrion.com\/ar\/wp-json\/wp\/v2\/tags?post=1989"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}