SPD Wiring Diagram: Single-Phase, Three-Phase and Solar, Plus the 0.5 m and 10 m Rules
Most installers wire an SPD to a free terminal, see the green indicator and move on. On the next surge the SPD operates exactly as designed, and the equipment downstream still fails.
The usual cause is wiring, not the SPD. Correct SPD wiring depends on two things: a connection type that matches the earthing system (TN, TT or IT), and a total conductor path of no more than 0.5 m from the live busbar, through the SPD, to the main earth bar. Every extra metre of lead adds roughly 1 kV to the voltage the equipment actually sees, on top of the SPD’s rated protection level (Up). Get the connection type and lead length right, and the datasheet Up is close to what reaches the load. Get either wrong, and the SPD can work perfectly while the protection fails.
Rating selection (Uc, Up, In, Iimp) is a separate decision covered in the surge protective device selection guide. Here, the device is already chosen and the job is connecting it correctly.
Read the Connection Notation Before Reading the Diagram
SPD wiring diagrams use a short notation for how many protection modes connect to what. The first number counts modules between live conductors and PE (or N); the second counts the N–PE module.
| Notation | Protection paths | Typical earthing system | Connection type |
|---|---|---|---|
| 2+0 (single-phase) | L–PE and N–PE, one module each | TN-S, TN-C-S (after the PEN split) | CT1 |
| 1+1 (single-phase) | L–N through a varistor; N–PE through a spark gap or GDT | TT, especially upstream of the main RCD | CT2 |
| 4+0 (three-phase) | L1, L2, L3 and N each to PE | TN-S | CT1 |
| 3+1 (three-phase) | L1, L2, L3 each to N; N–PE through a spark gap or GDT | TT three-phase; also widely used in TN-S | CT2 |
| 3+0 (three-phase) | L1, L2, L3 each to PEN or PE | TN-C; IT without distributed neutral | CT1 |
CT1 and CT2 are not quality grades. They answer one question: what happens when a varistor ages and starts to leak at power frequency. In a CT1 arrangement that leakage flows straight to PE. In a TT system with the SPD ahead of the main RCD, no RCD sees that leakage, so a failing varistor can feed a sustained fault current into the earth electrode with nothing to disconnect it. CT2 puts a spark gap or GDT in the N–PE path, which does not conduct at mains voltage, so an ageing varistor cannot create an earth leakage path. The full RCD positioning argument is in SPD before or after RCD.
Single-Phase SPD Wiring
TN-S and TN-C-S: 2+0
N and PE are separate at the SPD’s position, so each live conductor gets its own module to PE.
- L busbar → backup protection (fuse or MCB, if required by the datasheet) → SPD L terminal.
- N busbar → SPD N terminal.
- SPD PE terminal → main earthing terminal or PE bar, by the shortest possible route.
In TN-C-S, install the SPD downstream of the point where the PEN conductor splits into N and PE. The wiring is then identical to TN-S.
TT: 1+1 (CT2)
Where the SPD protects the whole installation and sits upstream of the main RCD, use 1+1: a varistor between L and N, and a spark gap or GDT between N and PE. Surge current between line and earth passes through both elements in series; at mains frequency the N–PE element stays open.

A 2+0 device is acceptable in a TT installation only when it is installed downstream of an RCD, where the RCD provides fault protection for that circuit. If one SPD is meant to cover everything at the origin, choose CT2.
IT systems
An IT system has no direct earth on the supply. After a first earth fault, a healthy phase can sit at line-to-line voltage relative to PE for hours until the fault is found. Uc must therefore be selected for that condition, not for normal phase-to-neutral voltage. This is a rating issue rather than a wiring one, but it is the most common reason an otherwise correctly wired SPD fails in IT networks.
Three-Phase SPD Wiring
TN-S: 4+0 or 3+1
Both are used. 4+0 places a module from each of L1, L2, L3 and N to PE. 3+1 places modules from each phase to N, plus one N–PE spark gap. In TN-S, 3+1 is often preferred because the N–PE spark gap blocks power-frequency leakage to PE, and the same device also suits TT installations, which simplifies stock for panel builders. Follow the earthing system first, then the manufacturer’s application note.
TN-C: 3+0
There is no separate neutral, so each phase connects to the PEN conductor. The PEN bar is the SPD reference terminal. Do not add a neutral module that has nowhere correct to go.
TT: 3+1 (CT2)
Three varistors from L1, L2 and L3 to N, plus one N–PE spark gap or GDT. This is the three-phase equivalent of single-phase 1+1, and the correct choice when the SPD sits ahead of the main RCD.

The 0.5 m Rule: Where the Extra Voltage Comes From
An SPD’s Up is measured at its own terminals. The equipment is not connected at the SPD terminals. It is connected to the busbar, and between busbar and earth bar the surge current also has to travel through the connecting leads.
A conductor has an inductance of roughly 1 μH per metre. A surge current rises at around 1 kA per microsecond. The voltage across the lead is:
ΔU = L × di/dt ≈ 1 μH/m × 1 kA/μs ≈ 1 kV per metre
The lead length that counts is the whole loop:
- l1: live busbar to the backup protective device
- l2: backup device to the SPD line terminal
- l3: SPD earth terminal to the main earth bar

The voltage the protected equipment actually sees is approximately:
Ueffective ≈ Up + (l1 + l2 + l3) × 1 kV/m
Illustrative example: an SPD with Up = 1.5 kV is wired with 1.0 m of total lead. Effective protection ≈ 1.5 + 1.0 = 2.5 kV.
Equipment in overvoltage category II in a 230/400 V system is commonly rated for a 2.5 kV impulse withstand. That margin has now gone. Electronics with lower withstand are already beyond it.
Shorten the same installation to 0.5 m: effective protection ≈ 2.0 kV, and the margin returns without changing the SPD.
IEC 60364-5-53 sets the preferred total connection length at 0.5 m or less, and treats 1.0 m as the practical maximum. If 1.0 m is unavoidable, select an SPD with a lower Up so that the effective level still sits below the equipment’s impulse withstand.
V-wiring removes l1 and l2
In a conventional branch connection, the SPD hangs off the busbar on its own pair of leads, and those leads sit in the surge path. In V-wiring (also called through-wiring), the incoming conductor lands on the SPD terminal and the outgoing conductor to the load leaves from the same terminal. The load is then effectively connected at the SPD terminals, so the branch inductance drops out of the equation. Only the earth-side lead remains, which is usually easy to keep short.
V-wiring is limited by the terminal’s current rating: the full load current now passes through the SPD terminal. Use it only where the SPD’s installation instructions permit through-wiring at the circuit’s load current.
Route the leads, not just measure them
Length is only half of it. Run the line and earth leads close together, preferably bundled or twisted, so the loop they enclose is small. A short lead that loops around the enclosure still picks up inductance and induced voltage. Keep protected outgoing cables away from the unprotected incoming cables so a surge cannot couple straight across the panel.
The Three Different “10 m” Rules
“The 10 m rule” is quoted constantly and almost never with the same meaning. There are three separate distances in SPD installation practice, and applying the wrong one leaves part of the system unprotected.

| Distance | What it controls | What goes wrong if ignored | Typical fix |
|---|---|---|---|
| SPD to protected equipment | How far downstream an SPD’s protection remains effective | Voltage oscillation and reflection on the cable raise the voltage at distant equipment, up to around twice the SPD’s level | Add a local Type 3 SPD close to sensitive equipment beyond about 10 m |
| Between cascaded Type 1 and Type 2 SPDs | Energy sharing between stages when no decoupling inductor is fitted | The Type 2 varistor clamps before the Type 1 spark gap fires and takes the lightning current it was not rated for | Combined Type 1+2 device, a decoupling inductor, or adequate cable length between stages |
| PV array to inverter DC input | Whether one SPD set at the inverter is enough | Surges induced on long DC cables reach the far end without protection | Install DC SPDs at both ends of the cable run |
Protective distance to the equipment
A surge travels along a cable as a travelling wave. At an equipment input that looks like a high impedance, the wave reflects, and the voltage there can approach twice the voltage at the SPD. IEC 61643-12 describes this oscillation effect; the commonly applied practical figure is that beyond around 10 m of cable, the main-board SPD can no longer be relied on to protect the equipment by itself.
In practice: a Type 2 SPD at the main distribution board protects equipment in and near that board. A PLC panel at the end of a 40 m feeder, a server rack across the building, or field instrumentation needs its own Type 3 SPD close to the equipment.
Coordination between cascaded SPDs
A Type 1 spark gap needs a voltage of a few kilovolts across it to fire. A Type 2 varistor clamps well below that. If both are mounted side by side with nothing between them, the varistor clamps first, the spark gap never sees enough voltage to fire, and the varistor takes the lightning current alone.
Separating them by enough cable adds the inductance needed for the spark gap to fire first. Around 10 m of cable is the figure usually quoted where the manufacturer does not give a specific coordination length; the actual requirement depends on the two devices, and some manufacturers specify shorter or longer distances.
In a compact switchboard, 10 m of cable is rarely practical. Use a combined Type 1+2 SPD that is tested as a coordinated unit, or a matched decoupling inductor from the same manufacturer.
Solar PV DC cable length
For PV systems, IEC 60364-7-712 practice is that when the DC cable between the array (or combiner box) and the inverter exceeds 10 m, SPDs are installed at both ends: one in the combiner box near the array and one at the inverter DC input. Below 10 m, protection at one end, normally the inverter, is usually sufficient. Check the inverter’s built-in protection first; many string inverters already include a Type 2 DC SPD at the input.
Solar PV DC SPD Wiring
DC SPDs for PV come in two common internal arrangements.
Y-configuration uses three elements: DC+ to a common node, DC– to the same node, and the node to PE. Each path to earth passes through two elements in series. This keeps the SPD from becoming a conduction path if one pole develops an earth fault, and it is the standard arrangement in modern PV SPDs designed to IEC 61643-31.
Two-pole (U) configuration connects DC+ to PE and DC– to PE through one element each. After a single earth fault on one pole, the opposite element is stressed with the full string voltage. Treat it as a legacy or special-case arrangement, and use it only where the SPD manufacturer and inverter manufacturer both specify it.

Connection sequence in a combiner box:
- Busbar DC+ → SPD DC+ terminal.
- Busbar DC– → SPD DC– terminal.
- SPD PE terminal → combiner box PE bar → array equipotential bonding conductor.
The same 0.5 m logic applies on the DC side. A combiner box PE bar that is not bonded to the array frame and the building earth leaves the SPD with no low-impedance return. For Ucpv and discharge current selection, use the guide to choosing a DC SPD for solar PV. Combiner box sizing and the position of fuses and isolators relative to the SPD are covered in what size solar combiner box you need.
Conductor Size and Backup Protection
The conductors to an SPD carry surge current, not continuous load current. They are sized for impulse withstand and mechanical strength, not by the ampacity tables used for load circuits.
| SPD type | Minimum earthing conductor | Note |
|---|---|---|
| Type 1 / Type 1+2 | 16 mm² | Lightning current path at the origin of the installation |
| Type 2 | 6 mm² | Line-side conductors are usually sized to match or follow the datasheet |
| Type 3 | As specified by the manufacturer | Often integrated in sockets or equipment; follow the product instructions |
The line-side leads should be at least as large as the datasheet requires and usually no smaller than the earthing conductor. Larger cross-section does not offset excess length: inductance depends mainly on length and routing, not on conductor size.
Backup protection protects against the SPD failing short-circuit at end of life. The SPD datasheet states the maximum backup fuse or breaker rating. If the upstream protection already falls within that limit, a separate backup device may not be needed; if it exceeds the limit, a dedicated backup device is required. An oversized backup device can let a failed SPD stay connected and overheat. The backup device also adds to l1 and l2, so position it as close to the busbar and the SPD as the panel allows.

Check the Wiring Before You Energize
- Measure the lead loop. Add l1 + l2 + l3 for each SPD with a tape. Record the figure. If it exceeds 0.5 m, move the SPD next to the earth bar, convert to V-wiring where the terminal rating allows, or confirm that the lower-Up alternative still protects the equipment.
- Match the connection type to the earthing system. CT1 ahead of the main RCD in a TT installation is a wiring error, whatever the device’s other ratings.
- Confirm conductor cross-sections against the installation instructions, especially the earth conductor on Type 1 and Type 1+2 devices.
- Confirm the backup protection rating does not exceed the datasheet maximum.
- Check the distances that need a second SPD. Sensitive equipment more than about 10 m from the board, PV cable runs over 10 m, and any Type 1 and Type 2 pair mounted without a coordination inductor.
- Record indicator status and test remote signalling. Note each module’s indicator at commissioning and, if the SPD has a remote contact wired to a BMS or alarm, simulate the fault state before closing the panel.
SPD Wiring Questions
Can I use the same SPD in TN-S and TT systems?
A 3+1 (CT2) device is generally suitable for both, which is why many panel builders standardize on it. A 4+0 or 2+0 (CT1) device is suitable for TN-S, but not upstream of the main RCD in a TT installation.
Does the SPD go before or after the main switch?
Normally after the main switch or main breaker, so it can be isolated for maintenance, and as close to the origin of the installation as possible. The relationship to the RCD depends on the connection type and earthing system.
My panel cannot achieve 0.5 m. What now?
Mount the SPD directly beside the main earth bar, use V-wiring if the terminals are rated for the load current, or choose an SPD with a lower Up that leaves enough margin after adding about 1 kV per metre of lead.
Can a Type 1 and Type 2 SPD sit next to each other on the same DIN rail?
Only if they are designed to coordinate at zero distance or a decoupling inductor sits between them. Otherwise, use a combined Type 1+2 device.
When selecting from the JUTRION SPD range, specify the earthing system and the installation position along with the electrical ratings. The connection type, the achievable lead length and any second-stage SPDs determine how much of the rated Up the equipment actually receives.
Technical References
- IEC 60364-5-53 — Low-voltage electrical installations: selection and erection of electrical equipment, including devices for protection against overvoltages and SPD connection requirements.
- IEC 61643-11 — Low-voltage surge protective devices connected to AC power systems: requirements and test methods.
- IEC 61643-12 — Low-voltage surge protective devices: selection and application principles, including protective distance and coordination.
- IEC 61643-31 — Low-voltage surge protective devices for photovoltaic installations: requirements and test methods.
- IEC 60364-7-712 — Requirements for special installations or locations: solar photovoltaic (PV) power supply systems.